Modern Furniture

Modern 5 Star Hotel Bedroom Bed

Foshan Qiaoyi Furniture Co., Ltd.
  • Style:Modern
  • Material:MDF with Painting+Solid Wod with Painting
  • Color:Red
  • Condition:New
  • Main Market:Middle East,European , Australia, USA, Africa, in
  • Cbm:1.79

Base Info

  • Model NO.:Z-2041
  • King Size:1800*2000
  • Model No.:Boy19-1
  • Packing:Kd
  • Package:Standard Export Seaway Packing
  • Loading Port:Shenzhen,Guangzhou
  • Keywords:Bedroom Furniture
  • Complete Set:5 PCS , 6PCS
  • Transport Package:Seafreight Packing, Standard Export Packing
  • Specification:MDF with melamine
  • Trademark:ZOE FURNITURE
  • Origin:China
  • HS Code:9403509100
  • Production Capacity:5000sets,Month

Description

TEM NO. DESCRIPTION DEMENSION(MM)BOY19-1 BED-1.8M 1917x2109x1250mmHBOY19-1 NIGHT TABLE 550x419x450mmHBOY19-1 Dresser table 1200x419x751mmHBOY19-1 Dresser mirror 1200x600x20mmHBOY19-1 Wardrobe- 4 doors 1657x635x2226mmH TOTAL: BED-1.8M+NIGHT TABLE 2PCS+DRESSER WITH MIRROR+FIVE WARDROBE 4 DOORS MOQ

 1.Furniture in stock: 5 sets.

  2.Furniture not in stock: 10 sets/items, 1*40HQ can have 3-4  items 

 Payment terms

 1.T/T,30% deposit  before production,balance paid before  loading

 2.L/C at sight

 3.Westion union for sample orders

 Inspection Before packing ,Our QC team will inspect at least two times to  ensure enough  quantity and strict quality control. Delivery  45-60 days after receipt 30% deposit or irrevocable L/C Warranty

  1.One year against manufacturing defect

  2.Offer lift time consultation on problem occurs

 Quality control

  1.Before production,we will check the material with colors and    features to make sure everything on the mass production are in  compliance with the sample

  2.Every steps of the production from the beginning to  shipping,we will keep close track

  3.QC will examinate strictly when production finished.

  4.You can rest assure that we can gurantee the clean and  complete items

     And a third party to check the quality is welcomed before  loading.

 

Material :


Modern 5 Star Hotel Bedroom Bed
Modern 5 Star Hotel Bedroom Bed
Modern 5 Star Hotel Bedroom Bed
Modern 5 Star Hotel Bedroom Bed
Modern 5 Star Hotel Bedroom Bed

FAQ:

1. Payment terms:

a. T/T, 30% deposit paid before production, balance paid before loading.

b. L/C, LC at sight.

c. western union for sample order

2. Inspection of goods:

1. We have our own QC department in the factory to make sure that all the products are in good condition and best quality before loading the container.

3. Quality control in production:


a. Before production, we will check the material with colors and features to make sure everything we are using on the mass production are strictly same as the sample shown.

b. We will be tracing every steps of the production from the beginning.

c. When item finished, QC checks.

d. Before packing, every items will be cleaned and checked.

e. Before loading, clients can send QC or point a third party to check the quality. we will try our best to help when problem occurs.

4. Delivery time:

45-60 days after 30% deposit paid or received L/C from the bank.

5. Warranty:

a. two years against manufacturing defect.

b. offer lifetime consultation on problem occurs.

6. After service:

a. We will be very thankful if you have any suggestions of our products.

b. If you have any questions, please feel free to let us know for first time by email or by phone, we will deal with the issue for you in time.

c. We will send catalogues with our new designs to the customers with developed partnership